Dating back to the 11th century, Tamworth Castle showcases how the historic site has developed over 900 years, as well as significant items from the Anglo-Saxon Staffordshire Hoard. The castle was added to the heritage at risk register in 2023, and funding from The Museum Estate and Development Fund (MEND), managed by Arts Council England, has contributed £1.7M to the restoration.
An ongoing multi-phase project, the restoration of the castle includes a complex programme of structural stabilisation, masonry repairs, and the repair of historic drainage systems. Inside, the repair of historic fabric and refurbished interiors will create environments ready to house museum collections and retain the building’s special character. During this, geo-archaeological investigations and historical discoveries have been made, requiring sensitive and bespoke measures to be implemented during the works.
Areas of the castle, as well as the grounds, will remain open through the restoration, allowing visitors to engage with the conservation work. The project is due to complete in Autumn 2027, and will improve the visitor experience and its operations.
Tamworth Bandstand
Built in 1900, Tamworth Castle’s Victorian bandstand has been enjoyed by the community for decades. Due to public safety concerns regarding structural integrity, the bandstand was closed for a number of years.
In October 2023, vandalism and investigations revealed damage to the Tamworth bandstand. An extensive conservation programme replaced timbers, floorboards and balustrades, carefully replicating the original craftsmanship. As a result, the bandstand has reopened to the public and hosts a busy calendar of events throughout the year.
Holloway Lodge
Tamworth Castle’s Holloway Lodge is a Gothic gateway to the castle grounds. The Grade II-listed structure dates back to 1810.
Repairs have safeguarded the historic fabric against climate impact, water ingress, overgrown vegetation. Exterior stonework has been repaired alongside the installation of the new water-tight roof, created using terne coated stainless steel and salvaged slate. These works have preserved the Lodge’s special historic character while making the space functional, supporting Tamworth Castle’s team and day-to-day operations.
| Castle Restoration Project: | |
| Client | Tamworth Borough Council |
| Architect | Donald Insall Associates |
| Contractor | Messenger BCR |
| Quantity Surveyor | Pulse Consult |
| Structural Engineer | Castree |
| Archaeology | York Archaeology |
| Ecologist | Collins Environmental Consultancy |
| Arboriculturist | Westside Forestry Ltd |
| Geotechnical Engineer | GD Pickles Ltd |
For project enquiries, careers, and anything else, please get in touch.
Be the first to hear about our latest news & projects